GET IN TOUCH
Home
About us
Services
Pile Foundations
Piling
Exposing & Hacking Cured Piles
Blinding & Formwork
Steel Works for Pile Caps
Concreting for Pile Caps
Bulk Earth Works
Deep Basement Excavation
Lateral support
Shotcrete
Mini Piling
Timber Lagging
Demolitions
Core Drilling
Equipment Leasing
Transport of Equipment – Low Loader Services
Pipelines
Equipment Lease
Gallery
Portfolio
Safety
Contact
Home
About us
Services
Pile Foundations
Piling
Exposing & Hacking Cured Piles
Blinding & Formwork
Steel Works for Pile Caps
Concreting for Pile Caps
Bulk Earth Works
Deep Basement Excavation
Lateral support
Shotcrete
Mini Piling
Timber Lagging
Demolitions
Core Drilling
Equipment Leasing
Transport of Equipment – Low Loader Services
Pipelines
Equipment Lease
Gallery
Portfolio
Safety
Contact
After the cured piles are exposed and hacked back to level, IOTA performs blinding and builds the formwork.
Hacking piles to level and blinding
Blinding after exposing and hacking the piles to level
Blinding after hacking piles to level
Blinding in preparation for building formwork
Blinding in preparation for formwork
Blinding
Shotcreting formwork walls
Construction of pile formwork
Formwork construction
Formwork ready for pile capping
Making Formwork for piles
Ongoing construction of pile formwork
Piling - Formwork construction
Formwork ready for steel works & pile capping
Using red soil to make formwork blocks for pile formwork
Formwork
Formwork
Piling - Making the formwork
1
/
20